2.12.2008

Our Additions to the Renovations

As of this week, our basement has walls and a ceiling. Along with the bathroom, the drywall is complete! However, before Adam began the work we wanted to leave part of our family here in our first house. We each wrote our name on one of the walls before he added the insulation and sheetrock. For the bathroom, he had to cement the pump into the floor. Before he poured the concrete, we each picked out an item of our own to bury into the floor.